System-Directed Putaway

System-directed putaway of received pallets and cases using warehouse management system assignments, covering scan confirmation of license plate and location, location capacity and weight limits, travel and placement rules, and the exception path when the directed location cannot be used.

Audience
Putaway associates, certified forklift and reach truck operators, and receiving leads
Review cycle
semiannual
Last reviewed
2026-08-15
Revision
1

System-Directed Putaway: what is in the procedure

7 sections. Regulatory language is fixed and passes through verbatim. Sections marked customized get rewritten around your facility, your equipment, and your job titles.

  1. 01

    Purpose

    Fixed

    This procedure establishes how received inventory is moved from the receiving staging area into its storage location under warehouse management system direction.

  2. 02

    Scope

    Customized

    This procedure applies to all system-directed putaway of palletized and case level inventory from the receiving staging area or the cross dock into reserve, pick face, bulk floor, or flow rack locations.

  3. 03

    Responsibilities

    Customized

    Putaway operators confirm each scan, verify the load is stable and within capacity before travel, and place the load only in the location the system directs or in a documented override location.

  4. 04

    Procedure: Directed Putaway

    Fixed

    1. Accept the task on the device and read the assignment: source staging location, license plate, item, quantity, and directed destination.

  5. 05

    Location Capacity and Slotting Limits

    Customized

    The directed location must respect four limits at once: the beam level's rated capacity, the location's cubic capacity, the pallet's height clearance to the beam above...

  6. 06

    Exception Handling

    Customized

    Stop and report, rather than improvising, whenever the directed location cannot be used.

  7. 07

    References

    Fixed

    29 CFR 1910.176 Handling materials, general.

Regulatory references

System-Directed Putaway: 29 CFR 1910.176(b)

Every SOP generated from this template cites the paragraphs below, with a plain-language summary of what each one requires. Citations are informational and are not legal advice.

Only loads within the rated capacity of the truck shall be handled.
29 CFR 1910.178(o)(2), eCFR, current text
StandardTitleWhat it requires
29 CFR 1910.176(b)Handling materials, general: secure storageStorage of material must not create a hazard. Material stored in tiers must be stacked, blocked, interlocked, and limited in height so that the storage is stable and secure against sliding or collapse. A system-directed location is only a suggestion about where inventory should live; the operator remains responsible for confirming that the load will actually sit stable and secure in that location.
29 CFR 1910.176(a)Handling materials, general: use of mechanical equipmentWhere mechanical handling equipment is used, sufficient safe clearances must be allowed for aisles, at loading docks, through doorways, and wherever turns or passage must be made. Aisles and passageways must be kept clear and in good repair, with no obstruction across or in an aisle that could create a hazard. Applied to putaway, this is the paragraph that forbids placing a load so it overhangs into the aisle.
29 CFR 1910.178(o)(2)Powered industrial trucks: loadingOnly loads within the rated capacity of the truck may be handled. Rated capacity is reduced by lift height, load center, and attachments, so the operator must read the truck's data plate and confirm the load is within capacity at the height it will be placed, not just at floor level.
29 CFR 1910.178(m)(2)Powered industrial trucks: truck operationsNo person may be allowed to stand or pass under the elevated portion of a truck, whether it is loaded or empty. During putaway this means the operator must clear and keep clear the area beneath and around a raised load before lifting into a rack location.
29 CFR 1910.22(a)Walking-working surfaces: general requirementsWalking-working surfaces must be kept in a clean, orderly, and sanitary condition and free of hazards such as spills, debris, and protruding objects that create slip, trip, or fall hazards. Aisles used for putaway travel, and the floor at the location being filled, fall under this requirement.

Compliance checklist

System-Directed Putaway: what an inspector looks for

  • Loads are placed so that storage is stable and secure against sliding or collapse

    29 CFR 1910.176(b)

  • No load overhangs into the aisle, which is kept clear and in good repair with safe clearance for mechanical handling equipment

    29 CFR 1910.176(a)

  • No load is pushed into the rack flue space, which is kept clear as a facility practice under the building's NFPA 13 sprinkler design

  • Loads are within the truck's rated capacity at the lift height and load center used

    29 CFR 1910.178(o)(2)

  • No one is permitted to stand or pass under an elevated load during placement

    29 CFR 1910.178(m)(2)

  • Putaway aisles and the floor at the location are kept clear of spills, debris, and protruding objects

    29 CFR 1910.22(a)

  • The license plate and the destination location are both scanned, not keyed or accepted by sight

  • Pallet and load condition is inspected before travel and unstable loads are corrected first

  • Sprinkler clearance and flue space are maintained and product is never stored above the top beam level

  • Overrides of a directed location are supervisor approved and recorded in the system

  • Damaged or tagged out of service locations are never loaded

Templates related to System-Directed Putaway

All Putaway templates
  • PutawayRev 1

    Lot Control and FEFO/FIFO Stock Rotation

    Lot control and stock rotation for lot-tracked and date-coded product, covering lot and date capture at receipt...

    Regulatory references
    5 CFR refs
    Sections
    9 sections
    Review cadence
    annual review
  • PutawayRev 1

    Pallet Rack Safety Inspection and Damage Reporting

    Routine inspection of pallet racking for damaged uprights, beams, footplates, and anchors...

    Regulatory references
    4 CFR refs
    Sections
    8 sections
    Review cadence
    annual review
  • PutawayRev 1

    Pick Face Replenishment

    Replenishment of forward pick faces from reserve storage, covering min/max and demand-driven triggers...

    Regulatory references
    5 CFR refs
    Sections
    8 sections
    Review cadence
    annual review
  • PutawayRev 1

    Putaway to Pallet Racking

    Safe putaway of palletized product into selective pallet racking, covering pallet and load inspection before travel...

    Regulatory references
    3 CFR refs
    Sections
    7 sections
    Review cadence
    annual review

Reading this template costs nothing. Generating it for your own building, with your equipment, your job titles and your sign-off sheet attached, is what the product does, on plans from $79 a month per building. You can start a 14-day free trial with no card and have this procedure back in minutes.

Free trial

Generate your System-Directed Putaway SOP

Answer the facility questionnaire once and this template comes back with your equipment, your titles, and your sign-off sheet attached.

14-day free trial, no credit card. Launch pricing.

This page is informational and is not legal advice. Have a qualified safety professional review any procedure before it goes into service at your facility.