SOPWAREHOUSESOP
Menu

Lockout/Tagout Application and Removal

Step-by-step application and removal of lockout/tagout energy controls for servicing and maintenance of machines and equipment, following the six-step sequence required by the energy control standard.

Audience
Authorized employees performing servicing or maintenance
Review cycle
annual
Last reviewed
2026-08-14
Revision
1

Lockout/Tagout Application and Removal: what is in the procedure

7 sections. Regulatory language is fixed and passes through verbatim. Sections marked customized get rewritten around your facility, your equipment, and your job titles.

  1. 01

    Purpose

    Fixed

    This procedure protects employees from injury caused by the unexpected energization, startup, or release of stored energy during servicing and maintenance.

  2. 02

    Scope

    Customized

    This procedure applies to servicing and maintenance of machines and equipment where unexpected energization, startup, or release of stored energy could cause injury.

  3. 03

    Responsibilities

    Customized

    Authorized employees apply and remove locks and tags.

  4. 04

    Procedure: Applying Lockout/Tagout

    Fixed

    1. Prepare: identify all energy sources, magnitudes, and hazards for the equipment; notify affected employees.

  5. 05

    Procedure: Removing Lockout/Tagout

    Fixed

    1. Inspect the work area: tools removed, guards reinstalled, machine components operationally intact.

  6. 06

    Special Cases

    Customized

    Shift change: the incoming authorized employee applies their lock before the outgoing employee removes theirs, so the equipment is never unprotected.

  7. 07

    References

    Fixed

    29 CFR 1910.147 The control of hazardous energy (lockout/tagout).

Regulatory references

Lockout/Tagout Application and Removal: 29 CFR 1910.147(c)(1)

Every SOP generated from this template cites the paragraphs below, with a plain-language summary of what each one requires. Citations are informational and are not legal advice.

Tagout devices shall warn against hazardous conditions if the machine or equipment is energized and shall include a legend such as the following: Do Not Start, Do Not Open, Do Not Close, Do Not Energize, Do Not Operate.
29 CFR 1910.147(c)(7), eCFR, current text
StandardTitleWhat it requires
29 CFR 1910.147(c)(1)Control of hazardous energy: energy control programThe employer must establish an energy control program consisting of energy control procedures, employee training, and periodic inspections to ensure machines are isolated and rendered inoperative before servicing.
29 CFR 1910.147(c)(4)Control of hazardous energy: energy control proceduresProcedures must be developed, documented, and used for the control of potentially hazardous energy, including specific steps for shutting down, isolating, blocking, and securing machines.
29 CFR 1910.147(d)Control of hazardous energy: application of controlLockout or tagout must be applied in sequence: prepare for shutdown, shut down the machine, isolate energy, apply lockout/tagout devices, relieve stored energy, and verify isolation before servicing begins.
29 CFR 1910.147(c)(7)Control of hazardous energy: training and communicationAuthorized employees must be trained in hazardous energy recognition and control; affected employees must be instructed in the purpose and use of the procedure.

Compliance checklist

Lockout/Tagout Application and Removal: what an inspector looks for

  • A written energy control program exists and covers this equipment

    29 CFR 1910.147(c)(1)

  • Equipment-specific energy control procedures are documented

    29 CFR 1910.147(c)(4)

  • The six-step application sequence is followed, including stored energy relief and verification

    29 CFR 1910.147(d)

  • Authorized and affected employees are trained and training is documented

    29 CFR 1910.147(c)(7)

  • The procedure is inspected periodically, at least annually

Templates related to Lockout/Tagout Application and Removal

All Lockout/Tagout templates
  • Lockout/TagoutRev 1

    Lockout/Tagout Periodic Inspection

    How to conduct the at least annual periodic inspection of each energy control procedure...

    Regulatory references
    4 CFR refs
    Sections
    8 sections
    Review cadence
    annual review
  • Lockout/TagoutRev 1

    Group Lockout and Shift Change Energy Control

    Group lockout procedure using a group lockbox and a primary authorized employee...

    Regulatory references
    4 CFR refs
    Sections
    8 sections
    Review cadence
    annual review
  • Management SystemsRev 1

    Business Continuity Plan

    Business continuity procedure covering the risk register of realistic disruption scenarios...

    Regulatory references
    Best practice
    Sections
    9 sections
    Review cadence
    annual review
  • Management SystemsRev 1

    Corrective and Preventive Action (CAPA)

    Facility-wide corrective and preventive action process covering what opens a CAPA, the numbered CAPA log...

    Regulatory references
    Best practice
    Sections
    9 sections
    Review cadence
    annual review

Reading this template costs nothing. Generating it for your own building, with your equipment, your job titles and your sign-off sheet attached, is what the product does, on plans from $79 a month per building. You can start a 14-day free trial with no card and have this procedure back in minutes.

Two of the free tools sit alongside this work: the Warehouse SOP checklist and the OSHA training matrix. Neither asks for an email.

Free trial

Generate your Lockout/Tagout Application and Removal SOP

Answer the facility questionnaire once and this template comes back with your equipment, your titles, and your sign-off sheet attached.

14-day free trial, no credit card. Launch pricing.

This page is informational and is not legal advice. Have a qualified safety professional review any procedure before it goes into service at your facility.